Oil & Gas – Arctic LNG 2 Module Fabrication (2021 – 2022)
Standard: AWS D1.1, D1.6
JSC awarded NDT contract from one of the Arctic LNG 2 major fabrication yards in China.
NDT work includes, RT (X-ray), MT, UT, PAUT, Document Control.