Copper Mine Process Plant Fabrication & Equipment FAT – Kamoa

Mining – Kamoa Mine – Process Plant Fabrication & Equipment FAT (2019 – 2023)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Standard: AWS D1.1

Copper Mine Process Plant Fabrication & Equipment FAT – Kamoa

Kamoa-Kakula ranks amongst the top 10 largest copper deposits globally, and holds the distinction of being the world’s largest high-grade copper deposit. According to a recent Mineral Resource estimate, Kakula, the second significant discovery at Kamoa, boasts Indicated Mineral Resources totaling 66 million tonnes with a copper grade of 6.59%, along with Inferred Resources of 27 million tonnes at 5.26% copper, using a 3% cut-off grade. Additionally, Kakula also exhibits Indicated Mineral Resources of 192 million tonnes with a copper grade of 3.45%, coupled with Inferred Resources of 101 million tonnes at 2.74% copper, utilizing a 1% cut-off grade. The inclusion of Kakula significantly enhances the combined Kamoa-Kakula Indicated Mineral Resources to 944 million tonnes with a copper grade of 2.83%, along with Inferred Resources of 286 million tonnes at 2.31% copper, based on a 1% cut-off grade.

JSC took part in Project Management, Fabrication Management, Quality Control during Kamoa Copper Project Fabrication on behalf of Kamoa Mine.

JSC also made efforts for FAT of processing and non-processing equipment.

Leave a comment

Your email address will not be published. Required fields are marked *